Project details:
1. Production scale: 2 SZLH508 granule production lines, equipped with one 160KW and one 132KW pulverizer, 2000KG/P mixer, 20 batching bins, 2 batching scales, 2 SZLH508 granulators, 2 SKLYF2400 cooling machine and 2 packaging lines, and a set of palletizers;
2. Four 1,500-ton grain silos, equipped with hydraulic flap automatic unloading equipment;
3. This project is equipped with a particle post-injection system to increase the oil content while reducing the powder content of the particles;
4. Steel structure main workshop.
The project will start construction in May 2021 and will be completed and put into production in March 2022. The current monthly output is about 10,000 tons.