Project details:
1. Production scale: 2 SZLH420 granular material production lines, equipped with one 132KW and one 90KW pulverizer, 2000KG/P mixer, 16 batching bins, 2 batching scales, 2 SZLH420 granulators, 2 SKLYF2000 cooling machine and 2 packaging lines, and a set of palletizers;
2. Three 500-ton grain silos and three 200-ton soybean meal silos;
3. 1000KG/P manual additive premix production line;
4. Steel structure main workshop.
The project started construction in May 2016 and was completed and put into operation in December. It will be produced at full capacity in 2017. The current monthly output is about 8,000 tons.